top of page

Each of these projects reflects our commitment to excellence, innovation, and customer satisfaction.

English

GAIP Project List 2007-2024

Imagen de WhatsApp 2024-08-08 a las 13.36.16_7db778ec.jpg

Period: July - September 2024

Company: GAIP SA DE CV

Business: Integrators

Client: Introsys

Project reference: Paulo Santos

Occupation: PLC programming

Activity: PLC programming support service at Volkswagen Autoeuropa facilities, Palmela, Portugal.

Period: March - June 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Heber Moreno
Occupation: Robot Programming
Activity: Production support with KUKA robots at the MAGNA Stampings plant in Saltillo for the Mainstream Floor project.

Period: March - June 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Isaid Martinez
Occupation: Robot Programming
Activity: Commissioning and programming of Spot joining technologies with ABB IRC5 robots and BOSCH 7000 controllers in Decklid, Quarter Inner Sub, Quarter Inner LH, and Quarter Inner RH with Gestamp V23 standard at GESTAMP II, Toluca, México.

Period: April - August 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Heber Moreno
Occupation: Robot Programming
Activity: Commissioning of 6 robots, relocation of 8 FANUC robots, and cycle time optimization for the Tesla Everest project at MAGNA Cosma, San Luis Potosí.

Period: February – April 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Raul Trejo
Occupation: Robot Programming
Activity: Programming and support for dimensional adjustment as well as production support for 21 KUKA robots at the MAGNA plant, Saltillo.

Period: September 2023 – June 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT MÉXICO
Project Reference: Raul Trejo
Occupation: Robot Programmer
Activity: Programming of 68 KUKA robots, DRY tests, and adjustments to achieve cycle time at the MAGNA Stampings plant, Saltillo.

Period: January – July 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Jesus Sanchez
Occupation: Robot Programming
Activity: Programming, optimization, and production of parts for the Battery Cover project at MAGNA COSMA, San Luis Potosí.

Period: April – May 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Sergio Luna Reyes
Occupation: Robot Programmer
Activity: Robot relocation, anti-collision reprogramming, and commissioning of a robot at SFT, Hermosillo, Sonora.

Period: January – March 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT USA
Project Reference: Sven Amey
Occupation: Robot Programmers
Activity: Programming and cycle time optimization of 17 FANUC robots at Magna Drive, Piedmont SC.

Period: June 2023 – June 2024

Company: GAIP SA DE CV
Business: Integrators
Client: Inpro Electric
Project Reference: Mattias Hillebrand
Occupation: Robot Programmers
Activity: Commissioning for the Q5 model at AUDI San Jose Chiapa, Puebla.

Period: December 2023 – February 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Heber Moreno
Occupation: Robot Programmer
Activity: Commissioning of 30 KUKA robots and BOSCH welding equipment, as well as DRY tests at FFT facilities, Puebla, for the Orion project.

Period: May – December 2023

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Jesús Sanchez
Occupation: Robot Programmer
Activity: Offline programming, commissioning, cycle time optimization, and production of 25 robots at the FFT Puebla plant for the Battery Cover project.

Period: March – December 2023

Company: GAIP SA DE CV
Business: Integrators
Client: INPRO ELECTRIC
Project Reference: Matthias Hillebrand
Occupation: Robot Programmer
Activity: ABB robot programming support for the Ford MACH-E model at Inpro, Puebla.

Period: September 2023 – June 2024

Company: GAIP SA DE CV
Business: Integrators
Client: FFT MÉXICO
Project Reference: Raul Trejo
Occupation: Robot Programmer
Activity: Programming of 68 KUKA robots, DRY tests, and adjustments to achieve cycle time at the MAGNA Stampings plant, Saltillo.

Period: March – November 2023

Company: GAIP SA DE CV
Business: Integrators
Client: FFT MÉXICO
Project Reference: Paris Moran
Occupation: Robot Programming
Activity: Commissioning of 17 robots, DRY tests, cycle time optimization, and production of the Sidewall line at the FFT plant, Puebla.

Period: February – December 2023

Company: GAIP SA DE CV
Business: Integrators
Client: FFT MÉXICO
Project Reference: Sergio Luna
Occupation: Robot Programming
Activity: Integration of 27 FANUC robots, rebalancing of welding points, and seal lines in the RR FLR MAIN LINE at the Sonora Forming Technologies plant, Hermosillo, Sonora.

Period: April – December 2023

Company: GAIP SA DE CV
Business: Integrators
Client: INPRO ELECTRIC
Project Reference: Matthias Hillebrand
Occupation: Robot Programming
Activity: Commissioning for the Q5 model at AUDI San Jose Chiapa, Puebla.

Period: October 2022 – May 2023

Company: GAIP SA DE CV
Business: Integrators
Client: FFT MÉXICO
Occupation: Robot Programming
Activity: Commissioning, programming, and cycle time optimization of 32 robots at the AUTOTEK plant, Cuautitlán.

Period: January – July 2022

Company: GAIP SA DE CV
Business: Integrators
Client: FFT Production Systems, Inc.
Project Reference: Miguel Carlock
Occupation: Robot Programmer
Activity: Programming of 50 robots for the construction of Fender LH/RH and Hood for Volvo Car at Magna Drive, Piedmont SC.

Period: December 2021 – December 2022

Company: GAIP SA DE CV
Business: Integrators
Client: FFT MÉXICO
Project Reference: Paris Moran
Occupation: Robot Programmer
Activity: Robot programming and cycle time optimization on the Front Rail and Wheel House lines at the Magna Formex plant, Saltillo.

Period: April – October 2022

Company: GAIP SA DE CV
Business: Integrators
Client: INPRO ELECTRIC
Project Reference: Matthias Hillebrand
Occupation: Robot Programmer
Activity: Commissioning for the Q5 model at AUDI San Jose Chiapa, Puebla.

Period: July 2021 – January 2022

Company: GAIP SA DE CV
Business: Integrators
Client: FFT MEX
Project Reference: Paris Moran
Occupation: Robot Programming
Activity: Cycle time optimizations on the Wheel House and Front Rail lines for the BEV3 lines at Formex, Saltillo.

Period: July 2021 – October 2021

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Paris Moran
Position: Robot Programmer
Activity: Virtual commissioning at FFT facilities, commissioning of 48 Fanuc robots at Magna Saltillo facilities, configuration of welding guns, manipulators, and review and correction of work sequences.

Period: December 2020 – March 2021

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Miguel Narváez
Position: Robot Programmer
Activity: Optimization of programs and cycle times of 3 automated cells with Fanuc robots for the Rear Floor B. 04425 Ford P758 project at SFT Magna Hermosillo.

Period: October 2020 – November 2020

Company: GAIP SA DE CV
Business: Integrators
Client: SLT/Mino Automation USA
Project Reference: Bruno Saravanja
Position: Robot Programmer
Activity: Commissioning of new clamps, programming of Picks, Drops, and Sealing in the RUB area, commissioning of Fanuc robots with the seventh axis, programming of Picks and Drops for the RPC line for the ONE part of the Y model at Tesla California.

Period: July 2019 – September 2020

Company: GAIP SA DE CV
Business: Integrators
Client: FFT de México
Project Reference: Dariusz Steckiewicz
Position: Robot Programmer
Activity: Optimization of the Side and AufBau lines to release the quality of the Q5 SB at Audi San José Chiapa, Puebla.

Period: December 2019 – April 2020

Company: GAIP SA DE CV
Business: Integrators
Client: FFT de México
Project Reference: Dariusz Steckiewicz
Position: Robot Programmer
Activity: Optimizations on the Q5 SB lines to achieve cycle times, process improvement, monitoring, and fault surveillance at Audi San José Chiapa, México.

Period: September 2019 – November 2019

Company: GAIP SA DE CV
Business: Integrators
Client: Introsys de México
Project Reference: Paulo Santos
Position: Robot Programmer
Activity: Commissioning, optimization of welding and handling programs on the AUF BAU lines for the TAREK project at VW China.

Period: April 2019 – August 2019

Company: GAIP SA DE CV
Business: Integrators
Client: FFT de México
Project Reference: Philippe Demeulenaere
Position: Robot Programmer
Activity: Integration and commissioning of tool changers, clamps, Servo calibrators, and programming with Kuka robots for the new Q5 Sport model at Audi San José Chiapa, México.

Period: January 2019 – March 2019

Company: GAIP SA DE CV
Business: Integrators
Client: FFT de México
Project Reference: Philippe Demeulenaere
Position: Robot Programmer
Activity: Commissioning and programming with Fanuc robots with arc welding technology for the SUV Magna Formex project at FFT México facilities.

Period: March 2018 – January 2019

Company: GAIP SA DE CV
Business: Integrators
Client: Serra Soldadura
Project Reference: Manel Masmitja Prada
Position: Robot Programmer
Activity: Commissioning, programming of ABB robots, Fronius equipment parameterization, and product release for the REAR SUB FRAME CX483 project at Serra Puebla, México, and Gestamp plant in Chelsea, Michigan.

Period: February 2018 – March 2018

Company: GAIP SA DE CV
Business: Integrators
Client: Introsys de México
Project Reference: Mario Fontes
Position: Robot Programmer
Activity: Production support and cycle time optimization in the UBII area for the Jetta A7 model in Hall 9 of Volkswagen México.

Period: November 2017 – January 2018

Company: GAIP SA DE CV
Business: Integrators
Client: Volkswagen de México
Project Reference: Víctor Muñoz
Position: Project Supervisor / Programmer
Activity: Integration of an automated cell with Kuka robots and the seventh axis in Hall 2 of Measurement at Volkswagen México.

Period: August 2017 - November 2017

Company: GAIP SA DE CV
Business: Integrators
Client: FFT México
Project Reference: Andrés García
Position: Robot Programmer
Activity: Commissioning of Fanuc robots, automatic tests, cycle time optimization, and production support on the Rear Cover lines for Magna Silao.

Period: April 2017 – August 2017

Company: GAIP SA DE CV
Business: Integrators
Client: Introsys de México
Project Reference: Mario Fontes
Position: Robot Programmer
Activity: Commissioning of Kuka robots, programming, automation tests of UBII lines for the Jetta A7 model in Hall 9 of Volkswagen México.

Period: June 2017 – April 2017

Company: GAIP SA DE CV
Business: Integrators
Client: Introsys de México
Project Reference: Mario Fontes
Position: Robot Programmer
Activity: Commissioning with Fanuc robots, programming, automatic tests, cycle time optimization, and production support in the lateral area for the Tiguan model in Hall 102 of Volkswagen México.

Period: January 2016 - April 2016

Company: GAIP SA DE CV
Business: Integrators
Client: Sca Schucker de México
Project Reference: Francisco Mendoza
Position: Robot Programmer
Activity: Creation of new urethane application paths with Kuka VKRC4 robots in 2 cells for the windshield and medallions of the new Tiguan model in Nave 21 at Volkswagen México.

Period: November 2016 – January 2017

Company: GAIP SA DE CV
Business: Integrators
Client: Volkswagen de México
Project Reference: Marco Antonio López
Position: Supervisor / Programmer
Activity: Integration of an automated cell with 2 Kuka robots with the seventh axis in Hall 51 of Measurement at Volkswagen México.

Period: February 2015 – July 2015

Company: GAIP SA DE CV
Business: Integrators
Client: Serra Welding
Project Reference: Manel Masmitja Prada
Position: Robot Programmer
Activity: Commissioning, programming, and automatic tests of Kuka KRC4 robots in

Period: November 2014 – January 2015

Company: GAIP SA DE CV
Business: Integrators
Client: Volkswagen de México
Project Reference: Marco Antonio López
Position: Robot Programmer
Activity: Migration of 2 Kuka VKRC2 robots to VKRC4, commissioning, and automatic tests on the AUF BAU 1 line in Nave 8 at Volkswagen de México.

Period: August 2014 – October 2014

Company: GAIP SA DE CV
Business: Integrators
Client: VIGOTEC
Project Reference: Ramón Castro
Position: Robot Programmer
Activity: Commissioning of Kuka KRC4 robots and automatic tests on the complete floor line for the G11/12 model at BMW Dingolfing, Germany.

Period: June 2013 – July 2014

Company: GAIP SA DE CV
Business: Integrators
Client: FFT de México
Project Reference: Philippe Demeulenaere
Position: Robot Programmer
Activity: Automatic commissioning, programming, and testing of Kuka KRC4 robots on complete floor lines for the C-Class model at Mercedes Benz Alabama, USA.

Period: February 2013 - May 2013

Company: GAIP SA DE CV
Business: Integrators
Client: FFT de México
Project Reference: Philippe Demeulenaere
Position: Robot Programmer
Activity: Commissioning, programming, and automatic testing with Kuka KRC4 robots on complete floor lines for the C-Class model at Mercedes Benz East London, South Africa.

Period: August 2012 - January 2013

Company: GAIP SA DE CV
Business: Integrators
Client: FFT de México
Project Reference: Philippe Demeulenaere
Position: Robot Programmer
Activity: Commissioning of Kuka KRC4 robots and automatic tests on complete floor lines for the C-Class model at Mercedes Benz Bremen, Germany.

Period: January 2012 - July 2012

Company: GAIP SA DE CV
Business: Integrators
Client: FFT de México
Project Reference: Raúl García
Position: Robot Programmer
Activity: Commissioning of Fanuc robots and automatic tests on the instrument panel line for the Ford Fusion model at Magna Sonora.

Period: December 2011 - January 2012

Company: Freelance
Business: Robot Programmer
Client: GRIP Group
Project Reference: Enrique Arroyo
Position: Robot Programmer
Activity: Migration of VKRC1 robots to VKRC2, software update, and reprogramming of trajectories for automatic screwing in the UBI Warehouse 2 area at Volkswagen México.

Period: September 2011 - November 2011

Company: Freelance
Business: Robot Programmer
Client: RAE
Project Reference: Carlos Santos
Position: Robot Programmer
Activity: Commissioning of Kuka robots in the complete floor area at BMW Shenyang, China.

Period: May 2011 - July 2011

Company: Freelance
Business: Robot Programmer
Client: RAE
Project Reference: Carlos Santos
Position: Robot Programmer
Activity: Commissioning with Kuka robots and automatic production tests in the rear left and right side rails area at BMW Rosslyn, South Africa.

Period: January 2010 - February 2011

Company: Freelance
Business: Robot Programmer
Client: Kuka Systems de México
Project Reference: Fernando Gato
Position: Robot Programmer
Activity: Commissioning with Kuka robots, automatic tests, and monitoring in the areas of: front doors, rear and front cover of the Jetta A6 model Nave 2 at Volkswagen México.

Period: June 2009 - December 2009

Company: Freelance
Business: Robot Programmer
Client: FFT de México
Project Reference: Philippe Demeulenaere
Position: Robot Programmer
Activity: Commissioning with Kuka robots, automatic tests, and monitoring in the UBI area of the Jetta A6 model Nave 82 at Volkswagen de México.

Period: March 2009 - May 2009

Company: Freelance
Business: Robot Programmer
Client: GRIP / Fanuc
Project Reference: Enrique Arroyo
Position: Robot Programmer
Activity: Migration of Kuka robots to Fanuc, commissioning, reprogramming, automatic tests, and monitoring in the rear floor area of the Jetta A4 model Nave 51 at Volkswagen México.

Period: December 2008 - February 2009

Company: Freelance
Business: Robot Programmer
Client: FFT de México
Project Reference: Raúl García
Position: Robot Programmer
Activity: Integration of new manipulators in Kuka robots in the front cover area Hall 2 to assemble the Bora and Variant GP models and develop new programs for the Variant model at Volkswagen de México.

Period: September 2008 - November 2008

Company: Freelance
Business: Robot Programmer
Client: FFT de México
Project Reference: Raúl García
Position: Robot Programmer
Activity: Commissioning with Fanuc and Nachi robots, automatic tests in the complete apartment area for Magna Saltillo.

Period: June 2008 - August 2008

Company: Freelance
Business: Robot Programmer
Client: Inpro Electric de Valencia
Position: Robot Programmer
Activity: Commissioning and automatic tests with Kuka robots in the complete floor area at SEAT in Barcelona, Spain.

Period: March 2007 - May 2008

Company: Freelance
Business: Robot Programmer
Client: Serra Welding
Position: Robot Programmer
Activity: Commissioning with Fanuc robots, automatic tests, process monitoring, and cycle time optimization at Gestamp Toluca.

Period: June 2005 - February 2007

Company: Freelance
Business: Robot Programmer
Client: IMG
Project Reference: Ivan Miranda
Position: Robot Programmer
Activity: Production support and process optimization of the Bora A5 model in the Stringers and floors N25 and N8 areas. Commissioning, automatic tests, and process monitoring with Kuka VKRC2 robots for seal application in the windshields in the assembly area Nave 4 for the Jetta A5 model at Volkswagen de México.

Imagen de WhatsApp 2024-08-08 a las 13.14.58_b6569342.jpg
Imagen de WhatsApp 2024-08-08 a las 13.23.03_c1c67b21.jpg
Imagen de WhatsApp 2024-08-08 a las 13.15.40_340b9390.jpg

2024

2023

2022

2020

2018

2016

2012

2010

2007

2012

bottom of page